Hungarian Hammerhead: Difference between revisions
Jump to navigation
Jump to search
m (1 revision) |
m (→Conflict) |
||
Line 28: | Line 28: | ||
== Conflict == | == Conflict == | ||
The Second Hungarian Army, spearheaded by the elite First Field Armored Division, had reached the River Don late in the summer of 1942 and planned to take up defensive positions behind it. Before this could be achieved, they needed to remove the three remaining Russian bridgeheads on the west side of the river. For two solid months they hammered the defenders, but only at Korotojak did they achieve their objective. | |||
== Versions History == | == Versions History == |
Latest revision as of 08:15, 25 April 2018
Hungarian Hammerhead | |
Publication: Dezign Pak 4 | |
Location: Korotojak Bridgehead, Russia | |
Scenario Date: 07/08/1942 | |
# of Turns: 7,5 | |
# of Maps: 2 | |
Maps Used: 02, 03, 44, 50 | |
Attacker: Hungarian | |
Defender: Russian |
Conflict
The Second Hungarian Army, spearheaded by the elite First Field Armored Division, had reached the River Don late in the summer of 1942 and planned to take up defensive positions behind it. Before this could be achieved, they needed to remove the three remaining Russian bridgeheads on the west side of the river. For two solid months they hammered the defenders, but only at Korotojak did they achieve their objective.
Versions History
- Scenario ESG43 in Dezign Pak 4
- Oct-08 Published by East Side Gamers
Victory Conditions
-
Balance
-
Errata
-
Analysis
-
After Action Report
-
VASL Logs
-
Download
-