Bridge Busters: Difference between revisions
Jump to navigation
Jump to search
(Import CoW 2008) |
|||
(One intermediate revision by one other user not shown) | |||
Line 28: | Line 28: | ||
== Conflict == | == Conflict == | ||
- | On the southern rim of the Kursk salient, the Russians launched a massive hammer blow on the German units maintaining that line in early August of 1943. The elite Grossdeutschland Division was immediately brought forward and launched a series of counterattacks on the Russian breakthrough. On this day, their assignment was the elimination of the threat created by a Russian bridgehead. The Grossdeutschland Division called upon its attached assault / demolition company - Panzer Kompanie (Funklenk) 311 - to handle the job using its radio-controlled B IV demolition vehicles... | ||
== Versions History == | == Versions History == |
Latest revision as of 18:23, 1 May 2018
Bridge Busters | |
Publication: Time On Target 3 | |
Location: Kholovdevchiya, Russia | |
Scenario Date: 14/08/1943 | |
# of Turns: 8,5 | |
# of Maps: 2 | |
Maps Used: 07, 18 | |
Attacker: German | |
Defender: Russian |
Conflict
On the southern rim of the Kursk salient, the Russians launched a massive hammer blow on the German units maintaining that line in early August of 1943. The elite Grossdeutschland Division was immediately brought forward and launched a series of counterattacks on the Russian breakthrough. On this day, their assignment was the elimination of the threat created by a Russian bridgehead. The Grossdeutschland Division called upon its attached assault / demolition company - Panzer Kompanie (Funklenk) 311 - to handle the job using its radio-controlled B IV demolition vehicles...
Versions History
- Scenario TOT38 in Time On Target 3
- 1996 Published by Kinetic Energy Productions
Victory Conditions
-
Balance
-
Errata
-
Analysis
-
After Action Report
-
VASL Logs
-
Download
-